Why LVL timber is the future
Read why LVL timber contributes to more sustainable building, lower emissions and high-grade modular housing.
No need to choose between traditional and modular
Modular building quickly brings to mind complete homes produced entirely in a factory and transported to site as a 3D module. But industrial production does not have to be that black and white. A contractor can carry on building their own home and still use the benefits of prefab production. That is exactly where LevelUp Housing can step in as production partner.
Your design stays the starting point
A project does not have to begin with a LevelUp housing concept. A contractor, architect or developer can come to us with a design of their own. Our engineers then look, together with the building partner, at how that design can be produced efficiently. The first question we ask is not: how do we turn this into a modular home? We ask instead: which components could we produce more efficiently in the factory? Sometimes the answer is a complete 3D module. On other projects the benefit lies in prefab walls, floors and roofs, or in individual CNC-machined LVL components.
2D, 3D or a combination
In 2D production we make complete wall, floor, roof or facade elements, for example. These then travel to the site and become part of the contractor's building process. In 3D production a larger share of the building is assembled in the factory. That can be a complete housing module, but equally a specific building component transported to site as a complete unit. On top of that, CNC production lets us make individual LVL components precisely, working from digital production drawings. And the combination is where it gets interesting. A project does not have to be carried out entirely in 2D or entirely in 3D.
The contractor stays the contractor
For us that is an important starting point. When we work with a contractor, they do not have to hand their housing concept, design or position within the project over to LevelUp. The contractor remains responsible for their own building project and decides with us where our production capacity is put to use. The contractor builds their home. LevelUp produces what can be made more efficiently in the factory. That way we add industrial production power without needlessly taking over the existing building process.
Buildability starts with engineering
We do not leave the choice between traditional building, 2D prefabrication and 3D production until the build begins.
Our engineers look early on at dimensions, structure, connections, repetition, transport and assembly, among other things. That lets us determine which components are suited to factory production and where traditional work on site makes more sense. So the aim is not to prefabricate as much as possible. The aim is to prefabricate where it genuinely pays off. From a single building component to a complete home
That makes the ways LevelUp can work together wide-ranging. On one project we produce CNC-machined LVL components only. On another, complete walls, floors and roofs. And another project is produced largely as a 3D modular home in our factory.